(908) 766-2510

1 Collyer Lane
Basking Ridge, NJ 07920

Online Services
Payments / Recreation 

Engineering

Location

Engineering Services Building
277 South Maple Avenue
Basking Ridge, NJ

Hours

Monday - Friday
8:30AM to 4:30PM

Staff

Engineering Information

The Engineering Services Department oversees the Engineering, Planning, Zoning, Fire Prevention Bureau and Construction Code Departments. This department also administers the Planning Board and Board of Adjustment. Close coordination is also maintained with the Agricultural Task Force, Environmental Commission, Shade Tree Commission, and other Township Departments.

The Engineering Department administers all land use and construction work in the Township. The land use reviews range from an individual resident's zoning concern to the review of large-scale residential and commercial projects. The site inspection staff reviews all development and Township construction. The Engineering staff provides in-house designs for road maintenance, drainage, and bikeway/sidewalk programs. Township tax and GIS data maps are also maintained by Engineering Department personnel.

The Department completed the engineering design and construction project management for the reconstruction and resurfacing of approximately 5 miles of Township roadway.

·         2024 Roads Paving

o    Dyckman Pl

o    Forbes Ct

o    Ashwood Ln

o    Linden Dr

o    Summit Dr

o    Hillcrest Way

o    Beechwood Rd

o    Oakley St

o    Voorhees Dr

o    North Voorhees Dr

o    Old Coach Rd

o    Carriage Way

o    Tuxford Tr

o    Essex Pl

o    Smithfield Ct

o    Plymouth Ct

o    Darren Dr

·         Somerville Road Path – a path was constructed from the existing path near Stone Ridge Lane to the intersection of Mountain Road, approximately ¾ of mile in length.

·         Lyons Road Path – various sections replaced comprising approximately 1.25 miles.

·         East Craig Street path was replaced.

  

On all projects listed above:

 

·         Sidewalks were repaired and ADA compliant curb ramps were constructed.

·         Stormwater infrastructure was repaired, and new stormwater facilities were installed.

·         Curbing repairs were completed.

·         Traffic control devices were replaced.