The Engineering Services Department oversees the Engineering, Planning, Zoning, Fire Prevention Bureau and Construction Code Departments. This department also administers the Planning Board and Board of Adjustment. Close coordination is also maintained with the Agricultural Task Force, Environmental Commission, Shade Tree Commission, and other Township Departments.

The Engineering Department administers all land use and construction work in the Township. The land use reviews range from an individual resident's zoning concern to the review of large-scale residential and commercial projects. The site inspection staff reviews all development and Township construction. The Engineering staff provides in-house designs for road maintenance, drainage, and bikeway/sidewalk programs. Township tax and GIS data maps are also maintained by Engineering Department personnel.

2021 Completed Projects

The Department completed the engineering design and construction project management for the reconstruction and resurfacing of approximately 9.2 miles of Township roadway in 2021.  These roads include:

  • Spring Valley Boulevard- King George Rd to English Place (NJDOT Municipal Aid Grant)
  • Mine Brook Road – between Old Coach Road and Whitenack Road (NJDOT Municipal Aid Grant in collaboration with the Borough of Far Hills)
  • 2021 Roads Paving Contract
    • Morrison Street
    • Berkeley Circle
    • Carteret Trail
    • Willow Street
    • Holmesbrook Road
    • Chapin Lane
    • Bullion Road
    • Wexford Way
    • Windsor Way
    • Granville Way
    • Palmerston Place
    • Somerville Road Extension
    • Everson Place
    • Overlook Avenue
    • High Meadow Lane
    • Green Mountain Drive
    • Shadowbrook Lane
    • Honeyman Road
    • Kings Ridge Road

Microsurfacing – 2.3 miles

  • Cherry Lane
  • Wildwood Drive
  • Ridgeview Drive
  • Pheasant Run
  • Fieldview Drive
  • Appletree Lane
  • Nickolas Way
  • Heritage Court
  • Woodman Lane

On all projects listed above:

  • Sidewalks were repaired and ADA compliant curb ramps were constructed.
  • Stormwater infrastructure was repaired, and new stormwater facilities were installed.
  • Curbing repairs were completed.
  • Traffic control devices were replaced.